E-CUATRO has achieved technical management for the construction works of RED ELECTRICA ZAL-PUERTO DE BARCELONA 220 kV substation and GAS NATURAL ZAL-PUERTO DE BARCELONA 220/25 kV substation in Prat de Llobregat. E-CUATRO has also achieved technical management for extension works of ENDESA 220 kV GIS substation in C’As Tresorer, Mallorca and ...
E-CUATRO provides technical support service, tracking and inspection of special equipment manufacture and installation which are essential in the project development. E-CUATRO achieves the revision and approval of the equipments documentation and the inspection of the manufacture, assembly and testing in the supplier factory and of the ...
E-CUATRO has advised and collaborated with TRALCA in order to obtain a public authorization for the building and operation of a new liquid storage terminal in Santander Port. E-CUATRO has large experience in valuating power generation plants. In this area, E-CUATRO collaborates with LGS Finance giving support and consulting engineering which ...
E-CUATRO has developed the basic and detailed engineering corresponding to the 132 kV GIS substation and 132 kV feeding line for the ACUAMED AGUILAS-GUADALENTIN Desalinization Plant. E-CUATRO has also developed engineering and assistance works for the substation and 132 kV line of VALDELENTISCO-ACUASEGURA desalinization plant connection to power ...
E-Cuatro has developed Projects for “Heymo Ingeniería” in order to obtain electric supply for several gas pipeline control valves and catodic protection systems. These engineering works include achievement of the request, pursuit and updates of the new supply application for the Power Utility Company in LV as in MV in each geographic area. It ...